Chapter 9 — Contract Modifications

9.4 Change in Transaction Price After a Contract Modification

9.4 Change in Transaction Price After a Contract Modification

The previous sections address situations involving a contract modification and a change in the amount of consideration in the contract. In those situations, the change in the amount of consideration occurred at the time of the modification and was a result of the modification. However, a contract’s consideration could also change when an entity reassesses the variable consideration of a contract at the end of a reporting period in accordance with ASC 606-10-32-14. This reassessment is required in all reporting periods for all contracts, including those that have been modified.